[1]
Tamzidhillah, M.F. and Waskito, J.P.H. 2022. PERCEPATAN PELAKSANAAN PROYEK MENGGUNAKAN METODE CPM DAN PERT (STUDI KASUS PROYEK PEKERJAAN KONSTRUKSI LANJUTAN F-MIPA TOWER MENARA SAINS TAHUN 2020 KAMPUS ITS). axial : jurnal rekayasa dan manajemen konstruksi. 10, 2 (Aug. 2022), 087–095. DOI:https://doi.org/10.30742/axial.v10i2.2485.