[1]
Citra, Z. et al. 2025. INTEGRASI LEAN CONSTRUCTION DAN MANAJEMEN RISIKO BERBASIS JAVA PROGRAMMING GUNA OPTIMASI BIAYA KONSTRUKSI PRECAST. Axial : Jurnal Rekayasa Dan Manajemen Konstruksi. 13, 1 (Apr. 2025), 038–046. DOI:https://doi.org/10.30742/axial.v13i1.4336.