[1]
Risdiyanti, A. and Siswoyo, S. 2018. ANALISA PERBANDINGAN BIAYA DAN WAKTU ANTARA METODE KONVENSIONAL DAN PRACETAK (STUDI KASUS : UNDERPASS BUNDARAN SATELIT MAYJEND SUNGKONO SURABAYA). axial : jurnal rekayasa dan manajemen konstruksi. 6, 2 (Aug. 2018), 69–78. DOI:https://doi.org/10.30742/axial.v6i2.508.