[1]
Hubert, W. and Huda, M. 2015. ANALISA FAKTOR RISIKO BIAYA PADA PEMBANGUNAN PERUMAHAN TYPE VICENZA THE GREENLAKE CITRALAND. axial : jurnal rekayasa dan manajemen konstruksi. 6, 2 (Aug. 2015), 99–112. DOI:https://doi.org/10.30742/axial.v6i2.511.