[1]
Ickman, G.E. et al. 2019. IDENTIFIKASI LIMBAH KONSTRUKSI PADA PEKERJAAN JEMBATAN SEMBAYAT BARU II DALAM RANGKA PENGHEMATAN BIAYA. axial : jurnal rekayasa dan manajemen konstruksi. 7, 1 (Oct. 2019), 43–52. DOI:https://doi.org/10.30742/axial.v7i1.707.