[1]
Hermawan, A. and Siswoyo, S. 2019. EVALUASI SENSITIVITAS KETERLAMBATAN DURASI PADA PROYEK GEDUNG UPT K3 SURABAYA DENGAN METODE CPM. axial : jurnal rekayasa dan manajemen konstruksi. 7, 3 (Dec. 2019), 163–172. DOI:https://doi.org/10.30742/axial.v7i3.773.