[1]
Vebiola, N.E. and Waskito, J.P.H. 2020. ANALISIS OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (Studi Kasus : Proyek Pembangunan Basement Kawasan Balai Pemuda). axial : jurnal rekayasa dan manajemen konstruksi. 8, 2 (Sep. 2020), 113–120. DOI:https://doi.org/10.30742/axial.v8i2.1032.