HERMAWAN, Andry; SISWOYO, Siswoyo. EVALUASI SENSITIVITAS KETERLAMBATAN DURASI PADA PROYEK GEDUNG UPT K3 SURABAYA DENGAN METODE CPM. Axial : Jurnal Rekayasa Dan Manajemen Konstruksi, [S. l.], v. 7, n. 3, p. 163–172, 2019. DOI: 10.30742/axial.v7i3.773. Disponível em: https://journal.uwks.ac.id/axial/article/view/773. Acesso em: 9 nov. 2026.