Sofiah, Rizqyatus, and Siswoyo Siswoyo. “OPTIMALISASI WAKTU PADA PELAKSANAAN PROYEK GEDUNG DENGAN MENGGUNAKAN METODE CPM DAN PERT (Studi Kasus Gedung Laboratorium School Internasional Unesa Surabaya)”. axial : jurnal rekayasa dan manajemen konstruksi 12, no. 1 (April 30, 2024): 023–028. Accessed January 18, 2026. https://journal.uwks.ac.id/axial/article/view/3659.