ANALISIS JARINGAN CPM-PERT UNTUK OPTIMALISASI PEMBANGUNAN WAHANA PERMAINAN BENGKEL SUROBOYO CARNIVAL
DOI:
https://doi.org/10.30742/equilibrium.v11i2.102Keywords:
park project, dynamic planning, scheduling system, scheduling problemsAbstract
Suroboyo Carnival is a interactive amusement park project. This amusement park required dynamic planning and scheduling system to produce the best possible results. This project must be to adapt with changing conditions and make necessary changes in the plan and schedule. PERT and CPM are used to analysis of project scheduling problems. CPM has single time estimate and PERT has three time estimates for activities and uses probability theory to find the chance of reaching the scheduled time. This paper used simple hypothetical to solve time schedulling with CPM-PERT technique. It expected duration is simulated and computed using the software package of POM for Windows. The result can facilitate the application of optimalization in CPM-PERT technique correctively and flexibly.
References
Bappenas, 2003. Perencanaan pembangunan nasional, Bappenas TA-SRPP, Jakarta
Badri, S. 1997. Dasar-Dasar Network Planing, PT Rika Cipta, Jakarta.
Bennatan, E.M. (1995). One Time within Budget : Software Project Management Practice and Techniques, John Wiley and Sons, Inc, New York.
Chase, R.B., N.J. Aquilano and F.B., Jacobs, 2007, Production and Operations Management: Manufacturing and Services, McGraw Hill.
Finch, B.J. 2007. Operations Now: Profitability, Processes, Performance. McGraw Hill.
Gray, C.F. & Larson. E.W.2006.Project Management, Mc-Graw Hill Companies Inc.
Hamilton, A. (1997). Management by Projecst, Thomas Telford, London.
Handoko, H. 1999.Manajemen Produksi dan Operasi, Yogyakarta: BPFE
Hary, P & Lukiastuti, F. 2009. Manajemen Operasi. MedPress. Yogyakarta
Heizer, J. and B. Render, 2007, Operations Management, Prentice Hall.
Kerzner, H. (2009). Project Management : A System Approach Controlling, John Willey & Sons, Inc, Hoboken, New Jersey.
Lei, X. 2011. Assumption Analysis and Duration Simulation of Three-Point Estimate in PERT technique, College of Management and Economy, Kunming University of Science and Technology
Marasović, J. & Marasović, T. 2006. CPM/ PERT Project Planning Methods as E-Learning Optional Support, Software in Telecommunications and Computer Networks,(hlm 352-356). SoftCOM
Mota, A. A. & Lia Toledo Moreira Mota, L. T. M. 2007. Visualization of Power System Restoration Plans Using CPM/PERT Graphs, IEEE Transactions on Power Systems, Vol. 22: 1322 - 1329
Downloads
Issue
Section
License
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work



