Analisa Kebutuhan Tenaga Kerja Purchasing Menggunakan Metode Full Time Equivalent (FTE) Di Politeknik XYZ
DOI:
https://doi.org/10.30742/equilibrium.v21i2.4863Keywords:
Purchasing, Workload Analysis, Full Time EquivalentAbstract
Purchasing is one of the fundamental functions of an organization in supporting operational work. Purchasing also plays a key role in meeting the quality standards required to maintain the organization's reputation. Thus, purchasing requires human resources who have the capability to carry out their duties productively, effectively, and efficiently. This study aims to analyze the effectiveness of employee workload in purchasing, whether it is excessive, normal, or insufficient. The test was conducted on employees at XYZ Polytechnic located in Bekasi Regency. The research used a descriptive qualitative and quantitative approach. The quantitative approach was carried out by distributing questionnaires to obtain initial data on workload perceptions. The qualitative approach was carried out through observation, interviews, and in-depth analysis of the actual work performed. The research analysis method used Full Time Equivalent (FTE), which is a workload analysis method based on measuring the time taken to complete work and converting it into an FTE index value with reference to Labor Law No. 13 of 2003 and Government Regulation No. 35 of 2021. The results of the study show that the workload of purchasing department employees is 216% and the FTE ratio index is 2.16. This means that the workload of purchasing employees at XYZ Polytechnic is excessive. Considering job satisfaction and the effectiveness of the purchasing function, it is recommended that one additional employee be hired, taking into account the required qualifications and creating policies that can optimize the purchasing function to be more optimal, efficient, and effective.
References
Abdullah, M. (2015). Metode Penelitian Kuantitatif. Yogyakarta: Aswaja Pressindo.
Alpiah & Nopiana, M. (2023). Analisis Pembelian Prosedur Barang Di Bagian Purchasing Pada PT XYZ (Studi Kasus Pada Perusahaan Kabel Di Kabupaten Karawang). Jurnal Ilmiah Wahana Pendidikan, 9 (25), 78–84.
Ardiansyah, M. R. N. & Susanto, A. (2024). Peranan Purchasing dalam Pengadaan Barang di Departemen Perusahaan PT Indobismar Surabaya. JUMBIWIRA : Jurnal Manajemen Bisnis Kewirausahaan, 3(2), 33–46. https://doi.org/10.56910/jumbiwira.v3i2.1575
Aryadi, H. & Wahyuni. (2019). Tinjauan Prosedur Pembelian Barang di Bagian Purchasing Pada PT Duraconindo Pratama Jakarta. Jurnal Akuntansi dan Manajemen (Vol. 16, Issue 02), 225-236.
Farhana, D. H. (2020). Analisis Beban Kerja Dalam Menentukan Jumlah Tenaga Kerja Optimal dengan Metode Workload Analysis di PT Jaya Teknik Indonesia Dinda Harum Farhana. Scientifict Journal of Industrial Engineering, 1(2), 18–22.
Irlana, S. F. (2020). Analisa Beban Kerja Dan Penentuan Tenaga Kerja Optimal Dengan Metode Workload Analysis (WLA) Di PT. Bintang Mas Glassolutions, Bedali, Lawang, Malang Jawa Timur-Indonesia. Jurnal Valtech (Jurnal Mahasiswa Teknik Industri), 3(2), 166–170.
Gunawan, A., Evelyne, K., Irman, A., Setiawan, H., Barleany, D. R., & Ulfah, M. (2023). Analisis Beban Kerja Untuk Menentukan Kebutuhan Tenaga Kerja Menggunakan Metode Full Time Equivalent (FTE) Pada PT So Good Food. Jurnal InTent (Vol. 6, Issue 1), 80-92.
Julia, M., & Masyruroh, A. J. (2022). Literature Review Determinasi Struktur Organisasi: Teknologi, Lingkungan, Dan Strategi Organisasi. JEMSI: Jurnal Ekonomi Manajemen Sistem Informasi, 3(4), 383–395.
Kabul, E. R., & Febrianto, M. N. (2022). Implementasi Metode Full Time Equivalent (FTE) Dalam Analisis Kebutuhan Tenaga Kerja. IKRAITH-EKONOMIKA, 5(1), 162-168.
Kemie, S. S., & Purba, S. D. (2019). Efek Mediasi Kepuasan Kerja Pada Pengaruh Keterikatan Kerja Dan Manajemen Karir Terhadap Keinginan Untuk Tetap Tinggal Di Dalam Organisasi (Studi Terhadap Para Pengajar di Akademi ATCKR). Equilibrium: Jurnal Ekonomi-Manajemen-Akuntansi, 15(1), 177–194.
Martina, E., & Kurniawan, B. (2020). Peranan Purchasing Dalam Menunjang Operasional Kitchen Di Angsana Hotel Bintan. Jurnal Daya Saing, 6(1), 30–37.
Muhardiansyah, H., & Widharto, Y. (2018). Workload Analysis Dengan Metode Full Time Equivalent (FTE) Untuk Menentukan Kebutuhan Tenaga Kerja Pada Dept. Produksi Unit Betalactam PT. Phapros, Tbk. Departemen Teknik Industri, Universitas Diponogoro, 1–8.
Prabowo, A., Setiawan, H., & Umiyati, A. (2017). Analisa Beban Kerja Dan Penentuan Tenaga Kerja Optimal Dengan Pendekatan Work Load Analysis (WLA). Jurnal Teknik Industri, 5(1), 40–45.
PP No. 35. (2021). Peraturan Pemerintah RI No 35 Tahun 2021 Tentang Perjanjian Kerja Waktu Tertentu, Alih Daya, Waktu Kerja & Waktu Istirahat, dan Pemutusan Hubungan Kerja.
Tchokogué, A., & Merminod, N. (2021). The purchasing department’s leadership role in developing and maintaining a preferred customer status. Journal of Purchasing and Supply Management, 27(2), 1-15. https://doi.org/10.1016/j.pursup.2021.100686
UU No.13. (2003). Undang-Undang RI No. 3 Tahun 2003 Tentang Ketenagakerjaan.
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work



