| ..:: ACCREDITED ::.. |
Vol. 6 No. 1 (2018): Volume 6, Nomor 1, Tahun 2018
Articles
-
PERBANDINGAN BRESING X-1 DAN X-2 PADA GEDUNG STRUKTUR BAJA DITINJAU DARI NILAI DRIFT
Abstract view : 551 times |
Download: 1311 times |
DOI :
https://doi.org/10.30742/axial.v6i1.476
-
OPTIMALISASI BIAYA PADA PEMBANGUNAN PROYEK GEDUNG RUMAH SAKIT BANGIL DENGAN MENGGUNAKAN METODE REKAYASA NILAI
Abstract view : 447 times |
Download: 690 times |
DOI :
https://doi.org/10.30742/axial.v6i1.471
-
PERENCANAAN PERKUATAN TIMBUNAN LERENG BANDAR UDARA SULAWESI SELATAN DENGAN GEOGRIDS DAN GABION TANA TORAJA "“ SULAWESI SELATAN
Abstract view : 641 times |
Download: 900 times |
DOI :
https://doi.org/10.30742/axial.v6i1.475
-
FAKTOR "“ FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PROYEK KONSTRUKSI DI SURABAYA
Abstract view : 4086 times |
Download: 9236 times |
DOI :
https://doi.org/10.30742/axial.v6i1.472
-
PERENCANAAN ULANG STRUKTUR JEMBATAN SEMBAYAT II GRESIK MENGGUNAKAN BALOK INDUK BETON PRATEGANG "V" PADA BENTANG KE-3
Abstract view : 539 times |
Download: 3293 times |
DOI :
https://doi.org/10.30742/axial.v6i1.473
-
PASIR KUARSA TUBAN SEBAGAI BAHAN SUBSTITUSI SEMEN DAN BATU PECAH SUBSTITUSI PASIR UNTUK CAMPURAN PAVING
Abstract view : 519 times |
Download: 4889 times |
DOI :
https://doi.org/10.30742/axial.v6i1.474









