ANALISIS JARINGAN CPM-PERT UNTUK OPTIMALISASI PEMBANGUNAN WAHANA PERMAINAN BENGKEL SUROBOYO CARNIVAL

Dana Aditya

Abstract


Suroboyo Carnival is a interactive amusement park project. This amusement park required dynamic planning and scheduling system to produce the best possible results. This project must be to adapt with changing conditions and make necessary changes in the plan and schedule. PERT and CPM are used to analysis of project scheduling problems. CPM has single time estimate and PERT has three time estimates for activities and uses probability theory to find the chance of reaching the scheduled time. This paper used simple hypothetical to solve time schedulling with CPM-PERT technique. It expected duration is simulated and computed using the software package of POM for Windows. The result can facilitate the application of optimalization in CPM-PERT technique correctively and flexibly.


Keywords


park project, dynamic planning, scheduling system, scheduling problems

Full Text:

PDF

References


Bappenas, 2003. Perencanaan pembangunan nasional, Bappenas TA-SRPP, Jakarta

Badri, S. 1997. Dasar-Dasar Network Planing, PT Rika Cipta, Jakarta.

Bennatan, E.M. (1995). One Time within Budget : Software Project Management Practice and Techniques, John Wiley and Sons, Inc, New York.

Chase, R.B., N.J. Aquilano and F.B., Jacobs, 2007, Production and Operations Management: Manufacturing and Services, McGraw Hill.

Finch, B.J. 2007. Operations Now: Profitability, Processes, Performance. McGraw Hill.

Gray, C.F. & Larson. E.W.2006.Project Management, Mc-Graw Hill Companies Inc.

Hamilton, A. (1997). Management by Projecst, Thomas Telford, London.

Handoko, H. 1999.Manajemen Produksi dan Operasi, Yogyakarta: BPFE

Hary, P & Lukiastuti, F. 2009. Manajemen Operasi. MedPress. Yogyakarta

Heizer, J. and B. Render, 2007, Operations Management, Prentice Hall.

Kerzner, H. (2009). Project Management : A System Approach Controlling, John Willey & Sons, Inc, Hoboken, New Jersey.

Lei, X. 2011. Assumption Analysis and Duration Simulation of Three-Point Estimate in PERT technique, College of Management and Economy, Kunming University of Science and Technology

Marasović, J. & Marasović, T. 2006. CPM/ PERT Project Planning Methods as E-Learning Optional Support, Software in Telecommunications and Computer Networks,(hlm 352-356). SoftCOM

Mota, A. A. & Lia Toledo Moreira Mota, L. T. M. 2007. Visualization of Power System Restoration Plans Using CPM/PERT Graphs, IEEE Transactions on Power Systems, Vol. 22: 1322 - 1329




DOI: http://dx.doi.org/10.30742/equilibrium.v11i2.102

Refbacks

  • There are currently no refbacks.


Copyright (c) 2017 Equilibrium (Jurnal Ekonomi-Manajemen-Akuntansi)

Indexed By:

      
      

  Creative Commons License

Equilibrium by http://journal.uwks.ac.id/index.php/equilibrium is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

 

 

 

 

 

 

Office: EQUILIBRIUM
Faculty of Economics and Business Universitas Wijaya Kusuma Surabaya
Dukuh Kupang XXV No. 54 Surabaya, Indonesia 60225 
Phone: +62315613231   
email: equilibrium@uwks.ac.id

p-ISSN 1693-1378 | e-ISSN 2598-9952