Vol. 7 No. 2 (2019): Volume 7, Nomor 2, Tahun 2019
Articles
-
PERENCANAAN STRUKTUR GEDUNG LFC BETON BERTULANG TAHAN GEMPA DENGAN MENGGUNAKAN SISTEM GANDA PADA DAERAH GEMPA TINGGI
Abstract view : 1165 times |
Download: 3675 times |
DOI :
https://doi.org/10.30742/axial.v7i2.751
-
KAJIAN PERENCANAAN POMPA BANJIR PADA KALI TEBU TAMBAK WEDI SURABAYA
Abstract view : 607 times |
Download: 1148 times |
DOI :
https://doi.org/10.30742/axial.v7i2.752
-
PERENCANAAN STRUKTUR GEDUNG APARTEMEN PERMATA INTAN DENGAN KONSTRUKSI BETON BERTULANG MENGGUNAKAN METODE SRPMK DI KOTA YOGYAKARTA
Abstract view : 1460 times |
Download: 3860 times |
DOI :
https://doi.org/10.30742/axial.v7i2.753
-
PERENCANAAN TEBAL PERKERASAN LENTUR DAN ANGGARAN BIAYA DI JALAN PARE-KEDIRI KOTA KEDIRI
Abstract view : 656 times |
Download: 1160 times |
DOI :
https://doi.org/10.30742/axial.v7i2.755
-
KAJIAN TINGKAT KEPENTINGAN MANAJEMEN PROYEK "PROCESS GROUP" MENURUT PMBOK5TH GUIDE (KONTRAKTOR KUALIFIKASI MENENGAH KOTA SURABAYA)
Abstract view : 552 times |
Download: 583 times |
DOI :
https://doi.org/10.30742/axial.v7i2.756
-
PERENCANAAN STRUKTUR GEDUNG HOTEL ROYAL ISNIN 10 LANTAI MENGGUNAKAN METODE SISTEM GANDA DI KOTA SURABAYA
Abstract view : 708 times |
Download: 5873 times |
DOI :
https://doi.org/10.30742/axial.v7i2.757
-
IDENTIFIKASI TINGKAT KEPENTINGAN PENERAPAN MANAJEMEN PROYEK KONSTRUKSI BERDASARKAN ISO 21500 PADA PROYEK KONSTRUKSI (STUDI KASUS PROYEK GEREJA MAWAR SHARON KOTA SURABAYA)
Abstract view : 1559 times |
Download: 4155 times |
DOI :
https://doi.org/10.30742/axial.v7i2.758
-
KAJIAN BANJIR DI WILAYAH KETINTANG SURABAYA
Abstract view : 1284 times |
Download: 2514 times |
DOI :
https://doi.org/10.30742/axial.v7i2.759
-
IDENTIFIKASI PENYEBAB TIMBULNYA LIMBAH PROYEK KONSTRUKSI DIKOTA SURABAYA
Abstract view : 455 times |
Download: 309 times |
DOI :
https://doi.org/10.30742/axial.v7i2.711
-
IDENTIFIKASI PENYEBAB TIMBULNYA LIMBAH PROYEK KONSTRUKSI DIKOTA SURABAYA
Abstract view : 286 times |
DOI :
https://doi.org/10.30742/axial.v7i2.712