| ..:: ACCREDITED ::.. |
Vol. 8 No. 2 (2020): Volume 8, Nomor 2, Tahun 2020
Articles
-
PERENCANAAN RIGID PAVEMENT DAN RENCANA ANGGARAN BIAYA DI JALAN BABAT "“ BATAS JOMBANG KABUPATEN LAMONGAN
Abstract view : 710 times |
Download: 1940 times |
DOI :
https://doi.org/10.30742/axial.v8i2.1029
-
PERENCANAAN KANTOR DINAS KEBUDAYAAN DAN PARIWISATA MENGGUNAKAN STRUKTUR BAJA SISTEM RANGKA BRESING KONSENTRIK KHUSUS TIPE TWO STORY X DI KOTA YOGYAKARTA
Abstract view : 740 times |
Download: 809 times |
DOI :
https://doi.org/10.30742/axial.v8i2.1030
-
IDENTIFIKASI RISIKO PELAKSANAAN PEMBANGUNAN GEDUNG BERTINGKAT MILIK PEMERINTAH KOTA SURABAYA
Abstract view : 813 times |
Download: 3080 times |
DOI :
https://doi.org/10.30742/axial.v8i2.1031
-
ANALISIS OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF (Studi Kasus : Proyek Pembangunan Basement Kawasan Balai Pemuda)
Abstract view : 1115 times |
Download: 1631 times |
DOI :
https://doi.org/10.30742/axial.v8i2.1032
-
ANALISA PERBAIKAN KERUSAKAN JALAN MENGGUNAKAN METODE PCI (Studi kasus : Jln. Babat "“ Batas Jln. Kab. Jombang STA. 10 "“ STA. 25)
Abstract view : 694 times |
Download: 1371 times |
DOI :
https://doi.org/10.30742/axial.v8i2.1033
-
PERENCANAAN STRUKTUR BETON BERTULANG GEDUNG APARTEMEN LYON DI KOTA YOGYAKARTA MENGGUNAKAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS
Abstract view : 683 times |
Download: 975 times |
DOI :
https://doi.org/10.30742/axial.v8i2.1034
-
PENERAPAN METODE COST SIGNIFICANT MODEL PADA ESTIMASI BIAYA PEMBANGUNAN KANTOR PELAYANAN MASYARAKAT DI KOTA SURABAYA
Abstract view : 559 times |
Download: 1141 times |
DOI :
https://doi.org/10.30742/axial.v8i2.1035
-
ANALISIS PENYEBAB TERJADINYA SISA MATERIAL PROYEK GEDUNG DI SURABAYA
Abstract view : 831 times |
Download: 1544 times |
DOI :
https://doi.org/10.30742/axial.v8i2.1036









