| ..:: ACCREDITED ::.. |
Vol. 8 No. 3 (2020): Volume 8: No. 3: 2020
Articles
-
ANALISIS PERBANDINGAN KEHILANGAN PRATEGANG METODE STRESSING SATU ARAH DAN DUA ARAH JEMBATAN BETON PRATEGANG PADA PROYEK JEMBATAN BENOWO SURABAYA
Abstract view : 835 times |
Download: 2923 times |
DOI :
https://doi.org/10.30742/axial.v8i3.1414
-
PERENCANAAN STRUKTUR GEDUNG APARTEMEN ROYAL PARADISE DENGAN KONSTRUKSI BETON BERTULANG MENGGUNAKAN METODE SRPMK DI KOTA BANDUNG
Abstract view : 927 times |
Download: 1111 times |
DOI :
https://doi.org/10.30742/axial.v8i3.1415
-
PENERAPAN VALUE ENGINEERING PADA PROYEK PEMBANGUNAN PUSKESMAS REGO MANGGARAI BARAT NTT
Abstract view : 1758 times |
Download: 4913 times |
DOI :
https://doi.org/10.30742/axial.v8i3.1416
-
DAMPAK PERCEPATAN DURASI PELAKSANAAN TERHADAP ANGGARAN PROYEK (STUDI KASUS : PEMBANGUNAN STRUKTUR GUDANG CRM PT SUN RISE MILL MOJOKERTO)
Abstract view : 583 times |
Download: 895 times |
DOI :
https://doi.org/10.30742/axial.v8i3.1417
-
PERCEPATAN WAKTU PELAKSANAAN PROYEK TERHADAP BIAYA KONTRAKTOR (Studi Kasus : Proyek Kozko Citraland Surabaya)
Abstract view : 649 times |
Download: 767 times |
DOI :
https://doi.org/10.30742/axial.v8i3.1418









