Vol. 6 No. 2 (2018): Volume 6, Nomor 2, Tahun 2018
Articles
-
ANALISA RISIKO ASPEK BIAYA PEKERJAAN SALURAN BOX CULVERT (STUDI KASUS JALAN KENJERAN DAN TENGGUMUNG KOTA SURABAYA)
Abstract view : 817 times |
Download: 2542 times |
DOI :
https://doi.org/10.30742/axial.v6i2.507
-
ANALISA PERBANDINGAN BIAYA DAN WAKTU ANTARA METODE KONVENSIONAL DAN PRACETAK (STUDI KASUS : UNDERPASS BUNDARAN SATELIT MAYJEND SUNGKONO SURABAYA)
Abstract view : 2052 times |
Download: 4124 times |
DOI :
https://doi.org/10.30742/axial.v6i2.508
-
ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI KESELAMATAN KERJA KARYAWAN PERUSAHAAN KONTRAKTOR DI SURABAYA
Abstract view : 2555 times |
Download: 8466 times |
DOI :
https://doi.org/10.30742/axial.v6i2.509
-
ANALISIS KINERJA PEMILIK PROYEK SWASTA DILINAI OLEH KONTRAKTOR SWASTA DI KOTA SURABAYA
Abstract view : 561 times |
Download: 953 times |
DOI :
https://doi.org/10.30742/axial.v6i2.510
-
ANALISA FAKTOR RISIKO BIAYA PADA PEMBANGUNAN PERUMAHAN TYPE VICENZA THE GREENLAKE CITRALAND
Abstract view : 625 times |
Download: 1769 times |
DOI :
https://doi.org/10.30742/axial.v6i2.511
-
STUDI KELAYAKAN PEMBANGUNAN APARTEMEN BIZ SQUARE SURABAYA
Abstract view : 1570 times |
Download: 8791 times |
DOI :
https://doi.org/10.30742/axial.v6i2.512
-
ANALISA PERKUATAN EMBANKMENT DI ATAS TANAH LUNAK (STUDI KASUS PERUMAHAN PAKUWON CITY SURABAYA)
Abstract view : 866 times |
Download: 1247 times |
DOI :
https://doi.org/10.30742/axial.v6i2.513
-
FAKTOR-FAKTOR YANG MEMPENGARUHI TERJADINYA LIMBAH PADA PROYEK HOTEL HOWARD JOHNSON SURABAYA
Abstract view : 484 times |
Download: 2189 times |
DOI :
https://doi.org/10.30742/axial.v6i2.514