Wisuda Periode April 2019
Table of Contents
Articles
PERENCANAAN STRUKTUR GEDUNG LFC BETON BERTULANG TAHAN GEMPA DENGAN MENGGUNAKAN SISTEM GANDA PADA DAERAH GEMPA TINGGI
![]() ![]() |
83-92
|
![]() |
93-100
|
PERENCANAAN STRUKTUR GEDUNG APARTEMEN PERMATA INTAN DENGAN KONSTRUKSI BETON BERTULANG MENGGUNAKAN METODE SRPMK DI KOTA YOGYAKARTA
![]() ![]() |
101-112
|
PERENCANAAN TEBAL PERKERASAN LENTUR DAN ANGGARAN BIAYA DI JALAN PARE-KEDIRI KOTA KEDIRI
![]() ![]() |
113-124
|
KAJIAN TINGKAT KEPENTINGAN MANAJEMEN PROYEK “PROCESS GROUP” MENURUT PMBOK5TH GUIDE (KONTRAKTOR KUALIFIKASI MENENGAH KOTA SURABAYA)
![]() ![]() |
125-136
|
PERENCANAAN STRUKTUR GEDUNG HOTEL ROYAL ISNIN 10 LANTAI MENGGUNAKAN METODE SISTEM GANDA DI KOTA SURABAYA
![]() ![]() |
137-146
|
IDENTIFIKASI TINGKAT KEPENTINGAN PENERAPAN MANAJEMEN PROYEK KONSTRUKSI BERDASARKAN ISO 21500 PADA PROYEK KONSTRUKSI (STUDI KASUS PROYEK GEREJA MAWAR SHARON KOTA SURABAYA)
![]() ![]() |
147-156
|
![]() |
157-162
|
IDENTIFIKASI PENYEBAB TIMBULNYA LIMBAH PROYEK KONSTRUKSI DIKOTA SURABAYA
![]() ![]() |
75-82
|
IDENTIFIKASI PENYEBAB TIMBULNYA LIMBAH PROYEK KONSTRUKSI DIKOTA SURABAYA
![]() ![]() |
75-82
|