ANALISA RISIKO ASPEK BIAYA PEKERJAAN SALURAN BOX CULVERT (STUDI KASUS JALAN KENJERAN DAN TENGGUMUNG KOTA SURABAYA)
DOI : 10.30742/axial.v6i2.507
Dwi Permadi, Miftahul Huda
|
53-68
|
ANALISA PERBANDINGAN BIAYA DAN WAKTU ANTARA METODE KONVENSIONAL DAN PRACETAK (STUDI KASUS : UNDERPASS BUNDARAN SATELIT MAYJEND SUNGKONO SURABAYA)
DOI : 10.30742/axial.v6i2.508
Alya Risdiyanti, Siswoyo Siswoyo
|
69-78
|
ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI KESELAMATAN KERJA KARYAWAN PERUSAHAAN KONTRAKTOR DI SURABAYA
DOI : 10.30742/axial.v6i2.509
Rudi Wijaya, Johan paing Heru Waskito
|
79-88
|
ANALISIS KINERJA PEMILIK PROYEK SWASTA DILINAI OLEH KONTRAKTOR SWASTA DI KOTA SURABAYA
DOI : 10.30742/axial.v6i2.510
Dwi Pranata, Miftahul Huda, Siswoyo Siswoyo
|
89-98
|
ANALISA FAKTOR RISIKO BIAYA PADA PEMBANGUNAN PERUMAHAN TYPE VICENZA THE GREENLAKE CITRALAND
DOI : 10.30742/axial.v6i2.511
Willy Hubert, Miftahul Huda
|
99-112
|
Rizal Mustofa, Agus Purwito Moestamin
|
113-122
|
ANALISA PERKUATAN EMBANKMENT DI ATAS TANAH LUNAK (STUDI KASUS PERUMAHAN PAKUWON CITY SURABAYA)
DOI : 10.30742/axial.v6i2.513
Debora Debora, Siswoyo Siswoyo
|
123-131
|
FAKTOR-FAKTOR YANG MEMPENGARUHI TERJADINYA LIMBAH PADA PROYEK HOTEL HOWARD JOHNSON SURABAYA
DOI : 10.30742/axial.v6i2.514
Faris Suwantoro, Titien Setiyo Rini
|
133-140
|