| ..:: ACCREDITED ::.. |
Vol. 7 No. 1 (2019): Volume 7, Nomor 1, Tahun 2019
Articles
-
ANALISA DRIFT GEDUNG STRUKTUR BAJA TAHAN GEMPA MENGGUNAKAN KOMBINASI TWO STORY-X BRACING DAN X BRACING DI SURABAYA
Abstract view : 1153 times |
Download: 3121 times |
DOI :
https://doi.org/10.30742/axial.v7i1.703
-
ANALISA RISIKO PROYEK PEMBANGUNAN UNIVERSITAS CIPUTRA TAHAP 4
Abstract view : 941 times |
Download: 974 times |
DOI :
https://doi.org/10.30742/axial.v7i1.704
-
ANALISA RISIKO KONTRAK KERJA LUMPSUM PADA PROYEK GEDUNG K3 SURABAYA
Abstract view : 824 times |
Download: 1955 times |
DOI :
https://doi.org/10.30742/axial.v7i1.705
-
ANALISA KEGAGALAN KONTRAKTOR DALAM PROSES TENDER SISTEM E-PROCUREMENT PADA PROYEK PEMKOT SURABAYA TAHUN
Abstract view : 2222 times |
Download: 2862 times |
DOI :
https://doi.org/10.30742/axial.v7i1.706
-
IDENTIFIKASI LIMBAH KONSTRUKSI PADA PEKERJAAN JEMBATAN SEMBAYAT BARU II DALAM RANGKA PENGHEMATAN BIAYA
Abstract view : 711 times |
Download: 1234 times |
DOI :
https://doi.org/10.30742/axial.v7i1.707
-
STUDI KELAYAKAN PROYEK PEMBANGUNAN PERUMAHAN GRAHA NATURA DI SURABAYA
Abstract view : 4020 times |
Download: 15081 times |
DOI :
https://doi.org/10.30742/axial.v7i1.708
-
PENGARUH KUALITAS JASA TERHADAP KEPUASAN PENUMPANG PESAWAT TERBANG DI BANDARA SYAMSUDIN NOOR BANJARMASIN
Abstract view : 1210 times |
Download: 1286 times |
DOI :
https://doi.org/10.30742/axial.v7i1.709
-
IDENTIFIKASI PENYEBAB TIMBULNYA LIMBAH PROYEK KONSTRUKSI DIKOTA SURABAYA
Abstract view : 459 times |
Download: 375 times |
DOI :
https://doi.org/10.30742/axial.v7i1.710









