Table of Contents
Articles
ANALISA RESIKO BIAYA DAN WAKTU KONSTRUKSI PADA PROYEK PEMBANGUNAN APARTEMEN BIZ SQUARE RUNGKUT SURABAYA
![]() ![]() |
141 - 154
|
PERENCANAAN STRUKTUR GEDUNG KAMPUS HNK MENGGUNAKAN SISTEM GANDA DI DAERAH SEMARANG
![]() ![]() |
155 - 164
|
ANALISIS KEPUASAN OWNER TERHADAP KINERJA KONTRAKTOR DI DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN LUMAJANG
![]() ![]() |
165-170
|
PERENCANAAN STRUKTUR GEDUNG HOTEL LEKO MENGGUNAKAN SISTEM GANDA DI KOTA BELITONG
![]() ![]() |
171-180
|
PERENCANAAN PELEBARAN DAN ANGGARAN BIAYA RUAS JALAN BULU (BATAS PROVINSI JAWA TENGAH) – TUBAN MENGGUNAKAN PERKERASAN LENTUR
![]() ![]() |
181-188
|
![]() |
189-198
|
KAJIAN DAMPAK LALU LINTAS TERHADAP KINERJA JALAN (Studi Kasus jalan Mayjen Sungkono – Jalan HR.Muhammad)
![]() ![]() |
199-206
|
PENGARUH MANAJEMEN KOMUNIKASI TERHADAP KINERJA PROYEK KONSTRUKSI (STUDI KASUS DI KOTA SURABAYA)
![]() ![]() |
207-214
|