|
Issue |
Title |
|
Vol 6, No 3 (2018): Volume 6, Nomor 3, Tahun 2018 |
KAJIAN DAMPAK LALU LINTAS TERHADAP KINERJA JALAN (Studi Kasus jalan Mayjen Sungkono – Jalan HR.Muhammad) |
Abstract
PDF
|
Taufik Akbar, Yeni Kartika Dewi |
|
Vol 8, No 1 (2020): Volume 8, Nomor 1, Tahun 2020 |
KAJIAN DRAINASE KAWASAN DESA PABIAN SUMENEP |
Abstract
PDF
|
Gusti Agung Prayoga, Soepriyono Soepriyono |
|
Volume 10, Nomor 3, Desember Tahun 2022 |
KAJIAN MANAJEMEN PELAKSANAAN K3 PEMBAGUNAN DEPO MAKASSAR |
Abstract
PDF
|
IGB Agung Putra Kusuma J., Johan Paing Heru Waskito |
|
Vol 7, No 2 (2019): Volume 7, Nomor 2, Tahun 2019 |
KAJIAN PERENCANAAN POMPA BANJIR PADA KALI TEBU TAMBAK WEDI SURABAYA |
Abstract
PDF
|
Fathur Reza Al Fatoni, Soebagio Soebagio |
|
Volume 9, No. 2, Agustus Tahun 2021 |
KAJIAN SISTEM DRAINASE DI WILAYAH WISMA LIDAH KULON SURABAYA BARAT |
Abstract
PDF
|
Ahmad Efendi, Soebagio Soebagio |
|
Vol 7, No 2 (2019): Volume 7, Nomor 2, Tahun 2019 |
KAJIAN TINGKAT KEPENTINGAN MANAJEMEN PROYEK “PROCESS GROUP” MENURUT PMBOK5TH GUIDE (KONTRAKTOR KUALIFIKASI MENENGAH KOTA SURABAYA) |
Abstract
PDF
|
Muchammad Zayyin Khilmi, Miftahul Huda |
|
Volume 9, No. 2, Agustus Tahun 2021 |
KEKUATAN PAVING BLOCK MENGGUNAKAN CAMPURAN ABU SEKAM PADI DAN KAPUR |
Abstract
PDF
|
Astri Wahyuningtias, Utari Khatulistiani |
|
Vol 6, No 1 (2018): Volume 6, Nomor 1, Tahun 2018 |
OPTIMALISASI BIAYA PADA PEMBANGUNAN PROYEK GEDUNG RUMAH SAKIT BANGIL DENGAN MENGGUNAKAN METODE REKAYASA NILAI |
Abstract
PDF
|
Yuridistira Ludfi Asrandy, Miftahul Huda, Johan Paing Heru Waskito |
|
VOLUME 12, NOMOR 1, APRIL TAHUN 2024 |
OPTIMALISASI WAKTU PADA PELAKSANAAN PROYEK GEDUNG DENGAN MENGGUNAKAN METODE CPM DAN PERT (Studi Kasus Gedung Laboratorium School Internasional Unesa Surabaya) |
Abstract
PDF
|
Rizqyatus Sofiah, Siswoyo Siswoyo |
|
Vol 7, No 3 (2019): Volume 7, Nomor 3, Tahun 2019 |
OPTIMASI KETERSDIAAN DAN KEBUTUHAN AIR IRIGASI DI DAERAH ALIRAN SUNGAI JAJAR DAERAH IRIGASI JATIROGO BONANG DEMAK JAWA TENGAH |
Abstract
PDF
|
Mohammad Khoerul Imam, Soebagio Soebagio |
|
Volume 11, Nomor 1, April Tahun 2023 |
OPTIMASI POLA OPERASI WADUK MADURAN KABUPATEN LAMONGAN PROVINSI JAWA TIMUR |
Abstract
PDF
|
Renaldi Aditya Rosandi, Soepriyono Soepriyono, Titien Setiyo Rini |
|
Vol 6, No 1 (2018): Volume 6, Nomor 1, Tahun 2018 |
PASIR KUARSA TUBAN SEBAGAI BAHAN SUBSTITUSI SEMEN DAN BATU PECAH SUBSTITUSI PASIR UNTUK CAMPURAN PAVING |
Abstract
PDF
|
Alfiyan Umurrudin, Utari Khatulistiani, Soerjandani Priantoro Machmoed |
|
Volume 10, Nomor 1, April Tahun 2022 |
PEMANFAATAN CAMPURAN LIMBAH KARET BAN DENGAN FILLER ABU KERANG SIMPING PADA ASPAL BETON |
Abstract
PDF
|
Kiki Nur Indah Sari, Akhmad Maliki, Akbar Bayu Kresno Suharso |
|
Volume 10, Nomor 2, Agustus Tahun 2022 |
PEMANFAATAN LIMBAH BATA RINGAN SEBAGAI BAHAN CAMPURAN PASIR PADA PEMBUATAN PAVING BLOCK |
Abstract
PDF
|
Arini Sukma Damayanti, Utari Khatulistiani |
|
Volume 9, No. 1, April Tahun 2021 |
PEMANFAATAN LIMBAH SANDAL KARET SEBAGAI MATERIAL SUBSTITUSI AGREGAT KASAR PADA CAMPURAN BETON |
Abstract
PDF
|
Maria Goreti Oktofiyane Fernandez, Utari Khatulistiani |
|
Volume 9, No. 2, Agustus Tahun 2021 |
PEMANFAATAN SEDIMEN LIMBAH SALURAN DRAINASE PERKOTAAN UNTUK PAVING BLOCK |
Abstract
PDF
|
Salsabila Khairunnisa, Andaryati Andaryati |
|
Volume 9, No. 1, April Tahun 2021 |
PEMANFAATAN SIRTU SEBAGAI BAHAN PEMBUATAN BETON DITINJAU DARI KUAT TEKAN BETON |
Abstract
PDF
|
Artha Adi Wiratama, Soerjandani Priantoro Machmoed |
|
Vol 8, No 2 (2020): Volume 8, Nomor 2, Tahun 2020 |
PENERAPAN METODE COST SIGNIFICANT MODEL PADA ESTIMASI BIAYA PEMBANGUNAN KANTOR PELAYANAN MASYARAKAT DI KOTA SURABAYA |
Abstract
PDF
|
Aydan Fafirru Ilallah, Johan Paing Heru Waskito |
|
Volume 10, Nomor 1, April Tahun 2022 |
PENERAPAN METODE CRASH PROGRAM UNTUK MENGANALISA KETERLAMBATAN WAKTU PENYELESAIAN PROYEK ( STUDI KASUS HOTEL SHAFIRA SURABAYA) |
Abstract
PDF
|
Norlin Regel, Johan Paing Heru Waskito |
|
Volume 10, Nomor 2, Agustus Tahun 2022 |
PENERAPAN REKAYASA NILAI PADA GEDUNG PERKULIAHAN (STUDI KASUS GEDUNG KULIAH BERSAMA DAN LABORATORIUM FEB UPN “VETERAN” JAWA TIMUR) |
Abstract
PDF
|
Rizta Ivania Devita, Siswoyo Siswoyo |
|
Vol 7, No 3 (2019): Volume 7, Nomor 3, Tahun 2019 |
PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN APARTEMEN BIZ SQUARE (MENARA RUNGKUT TOWER A) SURABAYA |
Abstract
PDF
|
Moh Choirul Umam, Miftahul Huda |
|
Volume 12, Nomor 3, Desember Tahun 2024 |
PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN APARTEMEN WESTOWN VIEW TOWER LA CHIVA SURABAYA |
Abstract
PDF
|
Achmad Naufal Hidayatullah, Siswoyo Siswoyo |
|
Vol 8, No 1 (2020): Volume 8, Nomor 1, Tahun 2020 |
PENERAPAN REKAYASA NILAI PEKERJAAN PELAT LANTAI PADA PROYEK PEMBANGUNAN HOTEL BATIQA PEKANBARU |
Abstract
PDF
|
Wahid Ramadhan, Miftahul Huda |
|
Volume 10, Nomor 2, Agustus Tahun 2022 |
PENERAPAN VALUE ENGINEERING PADA PROYEK PEMBANGUNAN APARTEMEN GUNAWANGSA GRESIK SUPERBLOCK TOWER A |
Abstract
PDF
|
Nola Pebriyanti Milinia, Siswoyo Siswoyo |
|
Volume 11, Nomor 1, April Tahun 2023 |
PENERAPAN VALUE ENGINEERING PADA PROYEK PEMBANGUNAN JEMBATAN MAUBASA BELU NTT |
Abstract
PDF
|
Kevin Martin Tanoni, Siswoyo Siswoyo, Soepriyono Soepriyono |
|
51 - 75 of 153 Items |
<< < 1 2 3 4 5 6 7 > >> |